FirstEnergy To Build New $45 Million Transmission Control Center In Akron

The Akron Control Center will feature advanced computer systems to monitor electrical grid reliability in various geographic areas of the country where FirstEnergy has operations. Nov 29, 2012 @ 11:26 AM

FirstEnergy Corp. has announced plans to construct a new state-of-the-art and environmentally friendly transmission control center in Akron, OH.  The highly secure facility will be built at the company’s West Akron Complex, an existing 150-acre site that already houses an Ohio Edison service center, a FirstEnergy call center, and a large office building where several company subsidiaries are based.

While preliminary site preparation work is being done this fall, groundbreaking for the 70,000-square-foot facility is expected to occur in the spring of 2013, with planned completion of construction by the end of the year.  The new “Akron Control Center,” as it will be known, is expected to cost approximately $45 million.

The new facility will replace the company’s existing Ohio Transmission Control Center located in Wadsworth, OH, which will be used as a back-up and training facility.  Most of the 112 employees who currently work in Wadsworth will be transferred to Akron in stages as the new facility is completed.

FirstEnergy expects to submit this project to be considered for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) certification.  LEED is an internationally recognized third-party green building certification system that recognizes buildings that have met the highest possible green building standards and verifies a project’s level of environmental responsibility and ability to provide occupants with a healthy place to live and work.

The Akron Control Center is being designed by Akron, OH-based Braun & Steidl Architects.  Fairlawn, Ohio-based Welty Building Company, which previously served as construction manager for FirstEnergy’s West Akron Campus, also will be construction manager for this project.  In addition, GPD, of Akron, is providing electrical/mechanical engineering services and Thorson Baker & Associates, of Richfield, Ohio, is doing site development and structural engineering.

“The new Akron Control Center is designed to make our current high level of transmission service reliability even better,” said Charles E. Jones, Jr., senior vice president and president, FirstEnergy Utilities.  “In addition, we will utilize high-performance, environmentally friendly design, construction and operational options for this new building.”

Daily News, Economic Development, Energy & Water, Industries, Ohio, Site Selection Factors, Sustainability, USA - Great Lakes

Akron Control Center, FirstEnergy, LEED, USGBC

Sponsored Content

Webinars, Podcasts & Videos

Minnesota is home to the #1 health care cluster in the world according to Medical Alley. In this short video we take a look at why.

Doing Business in Minnesota, a Mayo Clinic Business Development and Destination Medical Center Perspective

Hear from leaders at the Destination Medical Center and Mayo Clinic Business Development in Rochester about why they feel Minnesota is filled with opportunities for founders and why investors should consider the power of startups in Minnesota.

Innovation Tower is leading the evolution of the office environment to attract, inspire and retain top talent... San Antonio, Texas.

Innovation Tower: Where America’s Future Rises – San Antonio, Texas

Innovation Tower is leading the evolution of the office environment to attract, inspire and retain top talent.

Progress Labs at Center 85 in Frederick, Maryland is a five-building approximately 700,000 square foot development. Available for sale or lease. Permit ready.

Property Spotlight: Progress Labs at Center 85 – Frederick, Maryland

Progress Labs at Center 85 in Frederick, Maryland is a five-building approximately 700,000 square foot development. Available for sale or lease, and a Build-to-Suit Opportunity. Permit ready.

Share to...